APT Global Dubai was awarded a contract for the construction and delivery of 2 split hopper barges with a capacity of 2100 M3 for NMDC in June 2019. |
• | The vessel is equipped with a Cummins QSK19 D(M) diesel driven powerpack of 563kW |
• | The vessel is equipped with a HRP- bow thruster of 450kW capacity. |
• | The vessel is additionally fitted with a main generator set of 65kVA and a 31kVA harbor genset. |
• | FWD and AFT ballast system. |
• | The vessel is installed according to the latest requirements as per DR67 including an emergency dumping system,accurate draught indicators and monitoring system, wall mounted alarm panels at the wheelhouse. |
• | Remote control system both for dumping operation as well for bow thruster operation. |
Dimensions | ||
Length | : | 72.00 m |
---|---|---|
Breadth | : | 16.50 m |
Depth | : | 5.50 m |
Dredging Draught | : | 4.80 m |
Gross Tonnage | : | 1985 |
Net tonnage | : | 620 |
Capacity | : | 2100m3 |
Class | : | Bureau Veritas |
APT Global Starts Marine Support/Offshore Construction/Operations In Belgium
APT GLOBAL Delivers Sea Fastening Structure For Mammoet Project In Saudi
APT GLOBAL UAE - Ship Recycling Project. First Of Its Kind In The Middle East Region
APT Global Completes Major Docking of NMDC DREDGER UMM AL ANBER
Second APT Global yard with private waterfront, APT Global West yard, 175 meters Quay
APT Global Marine Services delivers two split hopper barges, first of its kind by a Middle East shipyard
APT forms strategic partnership with EPC Boiler Products & Services
APT completes huge piping fabrication/installation project for BESIX
APT constructs pontoons for ocean clean up, The Netherlands
APT converts sand carriers for Van Oord dredging contractors
APT Global and Innovo join hands to form a new company in UAE
APT Global certified with CE Mark for European conformity for its products
APT Global delivers 600 tonnes of Mission Equipment for Van Oord's Vessel Bravenes
APT Global 'lift off' as crane builder for TTS
Sports Day 2018
APT GLOBAL Completes Major Docking of Dredger for NMDC
APT Global launches new line of dredge ball joints
APT Global opens new office in The Netherlands
APT Global Builds Modular Pontoons for Africa
APT Global Constructs Straddle Carrier for Stevin Rock, RAK, UAE
APT Global delivers modular spud pontoon
APT Global successfully mobilizes Ampelmann heave compensating gangway
First berthing of vessel alongside our new quay wall
New APT yard with private waterfront
APT Global secures major repair project jack-up barge IB-909 for BAM international
Fugro oceanus delivered
Construction and installation booster station
APT Global launches AHP 1731 for Van Oord
Massive Achievement For APT Global