Project involved the flat top barge to be converted as rock transfer barge for operations in Palm Island, Dubai for Van Oord, Contractors, Netherlands.
Conceptual design provided by client was visualized and constructed to get the barge in operation.
Works involved the construction and installation of 100T capacity ramp, A-frames, accommodation/ operation module, 4 points mooring system and all hydraulic/ electrical safety systems.
Job was carried out in a time frame of 60 days.