Split Hopper- HUTA 909/910

  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
Description

APT Global Marine Services delivered two non-propelled 1800m3 Spit hopper barges to M/s HUTA Hegerfeld Saudia Ltd. The blocks for the vessels were constructed at a yard in Thailand and hereafter transported to APT facility at Ras Al Khaimah for completion and delivery..

The vessels named, HUTA 909 & HUTA 910, hit the water at APT Global RAK facility on November 2019.

With the delivery of these two Split hopper barges, APT Global Marine became the first Shipyard in the Middle East to construct and deliver this type of vessels. The vessels are classed under Bureau Veritas for unrestricted navigation. Also, the vessel complies with ARAMCO norms associated with floating craft.

HUTA909 & HUTA910 Specifications

Length :               76.70 m
Breadth :               14.50 m
Depth :               5.80 m
Dredging Draught  :               5.00 m
Gross Tonnage :               1558 T
Capacity :               1800 m3

 

New building

Anchor handling pontoon

Fugro oceanus

CSD-500

Modular pontoon

Split Hopper- HUTA 909/910

Split Hopper-Nareel

Split Hopper-Maghiam

Dry docking

Dry docking repairs HAM 218

Dry docking repairs AL HAMRA

Dry docking repairs IGAZU

Winbuild

TSC ZAAL

TUG DN-63

Aquamarine

Baldur

MACNA

MILTIADES4

Dry Docking repairs MIRFA

Conversion

Split hopper dredger to fall pipe vessel

Conversion of pontoon to side loading barge

Rock transfer barges conversion

Spreader pontoon conversion

Sand Carrier - Bow Coupling Tower Installation

Afloat repair

Afloat repair

Fairway

Oceanic Installer

Terraferre