Rock transfer barges conversion

  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
  • Rock transfer barges conversion
Description

Project involved the flat top barge to be converted as rock transfer barge for operations in Palm Island, Dubai for Van Oord, Contractors, Netherlands.

Conceptual design provided by client was visualized and constructed to get the barge in operation.

Works involved the construction and installation of 100T capacity ramp, A-frames, accommodation/ operation module, 4 points mooring system and all hydraulic/ electrical safety systems.

Job was carried out in a time frame of 60 days.

New building

Anchor handling pontoon

Fugro oceanus

CSD-500

Modular pontoon

Split Hopper- HUTA 909/910

Split Hopper-Nareel

Split Hopper-Maghiam

Dry docking

Dry docking repairs HAM 218

Dry docking repairs AL HAMRA

Dry docking repairs IGAZU

Winbuild

TSC ZAAL

TUG DN-63

Aquamarine

Baldur

MACNA

MILTIADES4

Dry Docking repairs MIRFA

Conversion

Split hopper dredger to fall pipe vessel

Conversion of pontoon to side loading barge

Rock transfer barges conversion

Spreader pontoon conversion

Sand Carrier - Bow Coupling Tower Installation

Afloat repair

Afloat repair

Fairway

Oceanic Installer

Terraferre